Product details
Model Number: ZKJ-GT50KW
Brand Name: ZONHAN
Key Specifications/Special Features:
ZKJ-GT (Grid-tie) model product characteristics:◆The product is manufactured according the JB/T6939.1-2004 industrial standard and GB/T 19115.1-2003 national standard also with users’ technical requirements.◆Two sets of control systems: PWM constant voltage system and three-phase dump load system.◆PWM constant voltage control is 120% of the rated power of the wind turbine. In case exceeding of PWM’s capacity, the three-phase dump load will automatically start immediately. After 10-20 minutes, the three-phase dump load will stop and the wind turbine will re-start to resume power supply to ensure the safe running of the overall wind turbine generation system.◆Under the strong or super-strong wind conditions, the controller can conduct constant voltage output to ensure the inverter safety running.◆Under the condition of disconnected grid-connected inverter, the controller can conduct constant voltage output and wait for inverter resumption.◆The three-phase dump load of the controller will automatically start and the inverter will stop grid output when the power grid is off. As soon as the grid power resuming, the controller stops three-phase dump load and the inverter will resume power supply.◆For the different wind turbine generator type, the controller can be equipped with mechanical yawing, furled empennage, mechanical or hydraulic, pneumatic, electric magnetic and other brake functions.
Type |
50klW |
100kW |
| Wind turbine rated power |
50kW |
100kW |
| Wind turbine Max. power |
100kW |
200kW |
| Function |
Rectifier, control |
| Display mode |
LCD |
| Display content |
Wind turbine voltage, wind turbine current, wind turbine power, DC output voltage, DC output current, DC output power |
| PWM constant voltage |
≥650dc |
≥650dc |
| Wind turbine 3-phase dump load voltage1 |
670±5Vdc |
670±5Vdc |
| Three-phase dump load 1 delay time |
12-20 min |
12-20 min |
| Wind turbine 3-phase dump load voltage2 |
680±5Vdc |
680±5Vdc |
| Three-phase dump load 2 delay time |
12-20 min |
12-20 min |
| Wind turbine 3-phase dump load voltage3 |
700±5Vdc |
700±5Vdc |
| Three-phase dump load 3 delay time |
12-20 min |
12-20 min |
| Low-voltage |
≤200Vdc |
≤200Vdc |
| PWM dump load fuse |
63A |
100A |
| Fuse of DC output |
100A |
200A |
| Self-provided connecting wire of the PWM dump load (mm) |
>10mm |
>20mm |
| Self-provided connecting wire of the dump load 1(mm) |
>10mm |
>16mm |
| Self-provided connecting wire of the dump load 2(mm) |
>10mm |
>16mm |
| Self-provided connecting wire of the dump load 3(mm) |
>10mm |
>16mm |
| Work environment temperature |
-30-60°C |
| Relative humidity |
<90% No condensation |
| Noise (1m) |
<40dB |
| Degree of protection |
IP20 (Indoor) |
| Cooling method |
Forced air cooling |
| *Communication interface (optional) |
RS485/USB/GPRS/Ethernet |
| *Temperature compensation(optional) |
-4mv/°C/2V,-35°C~+80°C, Accuracy:±1°C |
| Size of the controller (mm) |
690*590*1300 mm |
690*590*1300 mm |
| Weight of the controller |
120Kg |
120Kg |
| Size of the dump load (mm) |
760*520*1200(3pcs) |
760*520*1200(4pcs) |
| Weight of the dump load |
330Kg |
440Kg |
Shipping Information:
-
FOB Port:
Shanghai
-
Lead Time:
5
-
10
days
-
HTS Code:
8543.70.99 90
-
Dimensions per Unit:
69 × 59 × 130 Centimeters
-
Weight per Unit:
120 Kilograms
-
Units per Export Carton:
1
-
Export Carton Dimensions L/W/H:
75 × 65 × 135 Centimeters
-
Export Carton Weight:
128 Kilograms
Main Export Markets:
- Central/South America
- North America
- Western Europe